TEHRAN – Iran will soon sign contracts to increase gas production capacity before the end of the current Iranian calendar year (late March 2025), Oil Minister Mohsen Paknejad stated.
Speaking on the sidelines of the Gas Exporting Countries Forum…
TEHRAN – Iran will soon sign contracts to increase gas production capacity before the end of the current Iranian calendar year (late March 2025), Oil Minister Mohsen Paknejad stated.
Speaking on the sidelines of the Gas Exporting Countries Forum…
by
Tags:
Leave a Reply